Roadside stone handling installation tools.

10-Jan , 25

Features:

1, alloy steel forging, thickening alloy steel, high temperature quenching forging, strong

2, rubber non-slip chuck, polyurethane rubber material, no damage to stone, texture design can be non-slip

3, high strength chain, the chain is made of high strength manganese steel, thick chain, strong and not easy to break

4, thick self-locking nut, convenient and reliable, strong stability,strong

REQUEST A QUOTE

DESCRIPTION

1) Move the top plate to the packaging plate by skid rod and wedge, allowing enough space for the supporting plate of the fixture to pass through the plate and packaging plate. Do not move the top sheet through the balance plate to keep it in a tilted position.

2) Place the fixture flat in the center of the plate so that the load is smooth.

3) Ensure that the sheet is deeply clamped in the open jig.

4) Unlatch so that the clamp will lock onto the plate when the cable is lifted.

5) Slowly lift sheet load balance.

6) When lowering the lifting, ensure that there are no obstacles blocking the landing to ensure that the fixture can be removed after the lifting.

TAG:

handling

REQUEST A QUOTE

    Your country*

    Your Name*

Your phone

Your E-mail*

I am interested in...*

Your Message*

Reset